
LIANG DAR
Company History

LIANG DAR
Company History
- 1994
- Liang Dar was established
- 1997
- Liang Dar obtained ISO9002 certification
- 2001
- Liang Dar obtained QS9000 certification
- 2002
- Dongguan plant (Lianqiao) was established
- 2003
- Lianqiao obtained QS9000 certification
- 2004
- MCPCB by a well-known European lighting manufacturer was put into mass production
- Liang Dar successfully implemented ERP
- Lianqiao obtained ISO14001 and ISO9001:2000 certification
- 2005
- Group 10th anniversary
- Liang Dar obtained ISO14001:2004 certification
- 2006
- Second plant was launched by Liang Dar
- Liang Dar obtained TS16949:2002 certification
- Second plant was launched by Lianqiao
- Lianqiao obtained TS16949:2002 certification
- 2007
- Copper base and double-sided aluminum MCPCB were put into mass production
- Automotive LED MCPCB by well-known automotive makers were put into mass production
- Thick copper MCPCB for power supply unit was put into mass production
- Lianqiao obtained IECQ/QC080000 certification
- 2009
- Third plant was launched by Liang Dar
- Certified by a well-known Korean TV manufacturer
- Lianqiao began MCPCB mass production
- Lianqiao obtained Philips EICC certification
- 2010
- Lianqiao obtained BS OHSAS18001 certification
- 2013
- COB LED mirror aluminum MCPCB by a well-known European lighting manufacturer was put into mass production
- 2014
- Copper pedestal MCPCB for LED headlights by a well-known Japanese automotive makers was put into mass production
- 2015
- Third plant was launched by Lianqiao
- 2016
- The MCPCB process capability has been improved to 6.0mm thickness of copper and aluminum boards
- 2017
- Fourth plant was launched by Liang Dar
- Installed vertical continuous plating (VCP) equipment & alkaline and acidic vacuum etching lines
- Liang Dar obtained IATF16949 certification
- Liang Dar obtained GE SRG certification
- Lianqiao obtained IATF16949 certification
- 2018
- Lianqiao obtained GE SRG certification
- 2019
- Installed punching machine to expand capacity
- 2020
- Liang Dar successfully implemented Business Process Management (BPM)
- 2021
- Installed CCD LED double-sided exposure machine (soldermask) and CCD drilling machine to achieve the relative position tolerance within ±0.05mm
- Liang Dar launched Taoyuan plant
- Lianqiao obtained AEO certification from China customs
- 2022
- 14oz. thick copper MCPCB for electric motorcycle and heavy machinery was put into mass production
- 2023
- Installed Dedicated Arm Type Auto Test System
- 2024
- Installed Flying Probe Tester(Kelvin Four-terminal Sensing) and Legend Inkjet Printing System