- 1994- Liang Dar was established
 
- 1997- Liang Dar obtained ISO9002 certification
 
- 2001- Liang Dar obtained QS9000 certification
 
- 2002- Dongguan plant (Lianqiao) was established
 
- 2003- Lianqiao obtained QS9000 certification
 
- 2004- MCPCB by a well-known European lighting manufacturer was put into mass production
- Liang Dar successfully implemented ERP
- Lianqiao obtained ISO14001 and ISO9001:2000 certification
 
- 2005- Group 10th anniversary
- Liang Dar obtained ISO14001:2004 certification
 
- 2006- Second plant was launched by Liang Dar
- Liang Dar obtained TS16949:2002 certification
- Second plant was launched by Lianqiao
- Lianqiao obtained TS16949:2002 certification
 
- 2007- Copper base and double-sided aluminum MCPCB were put into mass production
- Automotive LED MCPCB by well-known automotive makers were put into mass production
- Thick copper MCPCB for power supply unit was put into mass production
- Lianqiao obtained IECQ/QC080000 certification
 
- 2009- Third plant was launched by Liang Dar
- Certified by a well-known Korean TV manufacturer
- Lianqiao began MCPCB mass production
- Lianqiao obtained Philips EICC certification
 
- 2010- Lianqiao obtained BS OHSAS18001 certification
 
- 2013- COB LED mirror aluminum MCPCB by a well-known European lighting manufacturer was put into mass production
 
- 2014- Copper pedestal MCPCB for LED headlights by a well-known Japanese automotive makers was put into mass production
 
- 2015- Third plant was launched by Lianqiao
 
- 2016- The MCPCB process capability has been improved to 6.0mm thickness of copper and aluminum boards
 
- 2017- Fourth plant was launched by Liang Dar
- Installed vertical continuous plating (VCP) equipment & alkaline and acidic vacuum etching lines
- Liang Dar obtained IATF16949 certification
- Liang Dar obtained GE SRG certification
- Lianqiao obtained IATF16949 certification
 
- 2018- Lianqiao obtained GE SRG certification
 
- 2019- Installed punching machine to expand capacity
 
- 2020- Liang Dar successfully implemented Business Process Management (BPM)
 
- 2021- Installed CCD LED double-sided exposure machine (soldermask) and CCD drilling machine to achieve the relative position tolerance within ±0.05mm
- Liang Dar launched Taoyuan plant
- Lianqiao obtained AEO certification from China customs
 
- 2022- 14oz. thick copper MCPCB for electric motorcycle and heavy machinery was put into mass production
 
- 2023- Installed Dedicated Arm Type Auto Test System
 
- 2024- Installed Flying Probe Tester(Kelvin Four-terminal Sensing) and Legend Inkjet Printing System
 