LIANG DAR

Company History

LIANG DAR

Company History

 
1990-2004
  • 1994
    • Liang Dar was established
  • 1997
    • Liang Dar obtained ISO9002 certification
  • 2001
    • Liang Dar obtained QS9000 certification
  • 2002
    • Dongguan plant (Lianqiao) was established
  • 2003
    • Lianqiao obtained QS9000 certification
  • 2004
    • MCPCB by a well-known European lighting manufacturer was put into mass production
    • Liang Dar successfully implemented ERP
    • Lianqiao obtained ISO14001 and ISO9001:2000 certification
 
2005-2008
  • 2005
    • Group 10th anniversary
    • Liang Dar obtained ISO14001:2004 certification
  • 2006
    • Second plant was launched by Liang Dar
    • Liang Dar obtained TS16949:2002 certification
    • Second plant was launched by Lianqiao
    • Lianqiao obtained TS16949:2002 certification
  • 2007
    • Copper base and double-sided aluminum MCPCB were put into mass production
    • Automotive LED MCPCB by well-known automotive makers were put into mass production
    • Thick copper MCPCB for power supply unit was put into mass production
    • Lianqiao obtained IECQ/QC080000 certification
 
2009-2015
  • 2009
    • Third plant was launched by Liang Dar
    • Certified by a well-known Korean TV manufacturer
    • Lianqiao began MCPCB mass production
    • Lianqiao obtained Philips EICC certification
  • 2010
    • Lianqiao obtained BS OHSAS18001 certification
  • 2013
    • COB LED mirror aluminum MCPCB by a well-known European lighting manufacturer was put into mass production
  • 2014
    • Copper pedestal MCPCB for LED headlights by a well-known Japanese automotive makers was put into mass production
  • 2015
    • Third plant was launched by Lianqiao
 
2016-2019
  • 2016
    • The MCPCB process capability has been improved to 6.0mm thickness of copper and aluminum boards
  • 2017
    • Fourth plant was launched by Liang Dar
    • Installed vertical continuous plating (VCP) equipment & alkaline and acidic vacuum etching lines
    • Liang Dar obtained IATF16949 certification
    • Liang Dar obtained GE SRG certification
    • Lianqiao obtained IATF16949 certification
  • 2018
    • Lianqiao obtained GE SRG certification
  • 2019
    • Installed punching machine to expand capacity
 
2020-2024
  • 2020
    • Liang Dar successfully implemented Business Process Management (BPM)
  • 2021
    • Installed CCD LED double-sided exposure machine (soldermask) and CCD drilling machine to achieve the relative position tolerance within ±0.05mm
    • Liang Dar launched Taoyuan plant
    • Lianqiao obtained AEO certification from China customs
  • 2022
    • 14oz. thick copper MCPCB for electric motorcycle and heavy machinery was put into mass production
  • 2023
    • Installed Dedicated Arm Type Auto Test System
  • 2024
    • Installed Flying Probe Tester(Kelvin Four-terminal Sensing) and Legend Inkjet Printing System